Table 7 CDG equation: \(\mathbb {L}_{2}\) relative error and time cost of PINN(tanh) and PINN(sine).
Solution | Method | ||
---|---|---|---|
PINN(tanh) | PINN(sine) | ERR | |
u(x, t) | \(4.47\times 10^{-2}\) | \(1.25\times 10^{-2}\) | 72.03% |
Time cost | 185 s | 312 s | − |
Solution | Method | ||
---|---|---|---|
PINN(tanh) | PINN(sine) | ERR | |
u(x, t) | \(4.47\times 10^{-2}\) | \(1.25\times 10^{-2}\) | 72.03% |
Time cost | 185 s | 312 s | − |