Table 6 Program of consolidation tests performed on samples made with a combination of two additives.
Designation | Volcanic Ash (%) | Fly Ash (%) | Cement (%) | Lime (%) | Marble powder (%) | Curing period (day) |
---|---|---|---|---|---|---|
S90C5VA5-7D | 5 | – | 5 | – | – | 7 |
S90C5VA5-28D | 5 | – | 5 | – | – | 28 |
S95C2.5VA2.5-7D | 2.5 | – | 2.5 | – | – | 7 |
S95C2.5VA2.5-28D | 2.5 | – | 2.5 | – | – | 28 |
S90C5FA5-7D | – | 5 | 5 | – | – | 7 |
S90C5FA5-28D | – | 5 | 5 | – | – | 28 |
S95C2.5FA2.5-7D | – | 2.5 | 2.5 | – | – | 7 |
S95C2.5FA2.5-28D | – | 2.5 | 2.5 | – | – | 28 |
S90C5MP5-7D | – | – | 5 | – | 5 | 7 |
S90C5MP5-28D | – | – | 5 | – | 5 | 28 |
S95C2.5MP2.5-7D | – | – | 2.5 | – | 2.5 | 7 |
S95C2.5MP2.5-28D | – | – | 2.5 | – | 2.5 | 28 |
S90VA5L5-7D | 5 | – | – | 5 | – | 7 |
S90VA5L5-28D | 5 | – | – | 5 | – | 28 |
S95VA2.5L2.5-7D | 2.5 | – | – | 2.5 | – | 7 |
S95VA2.5L2.5-28D | 2.5 | – | – | 2.5 | – | 28 |
S90VA5MP5-7D | 5 | – | – | – | 5 | 7 |
S90VA5MP5-28D | 5 | – | – | – | 5 | 28 |