Table 10 Results comparison with previous studies with uncertainty.
Item/parameter | Contribution | Active power loss (kW) | Energy not-met (kWh/yr) |
---|---|---|---|
TFWO34 | Probabilistic allocation of PV and WT | 1194.65 | 167.80 |
MOIGBO (σ = 5%) | Robust allocation of PV and WT | 829.45 | 125.43 |
MOIGBO (σ = 30%) | Robust allocation of PV and WT | 1067.09 | 161.15 |