Table 2 Techno-economic WT data38,39,40.

From: An information gap decision theory and improved gradient-based optimizer for robust optimization of renewable energy systems in distribution network

Parameter

Value

Nominal power (MW)

1

Nominal WS (m/s)

13

Cut-in WS (m/s)

3

Cut-out WS (m/s)

20

Capital cost ($/unit)

3000

M&O cost ($/yr)

30

life span

20