Table 4 Fuzzy final solution and results of solving the Scenario#1.
Case | Method | Final solution | AAEL (kWh) | ENM (MWh/yr) | RGC ($) | ||
---|---|---|---|---|---|---|---|
Size (kW) | Power factor | Location (bus) | |||||
Without RES | – | 0 | 0 | – | 603,362.93 | 214.03 | – |
Case I | MOIGBO | 628.18 | 1 | 16 | 302,751.62 | 118.64 | 58,979 |
978.63 | 0.84 | 33 | |||||
MOGBO | 667.35 | 1 | 17 | 304,417.16 | 119.62 | 59,313 | |
990.04 | 0.81 | 33 | |||||
MOPSO | 641.54 | 1 | 18 | 308,030.32 | 115.67 | 59,108 | |
992.20 | 0.83 | 33 | |||||
Case II | MOIGBO | 102.27 | 1 | 16 | 427,565.88 | 144.64 | 50,928 |
845.05 | 0.85 | 16 | |||||
MOGBO | 298.83 | 1 | 16 | 429,249.33 | 147.66 | 51,328 | |
808.22 | 0.80 | 16 | |||||
MOPSO | 346.40 | 1 | 16 | 427,755.13 | 145.04 | 51,830 | |
840.15 | 0.83 | 16 |