Table 8 Energy not-met of the network with respect to the different uncertainty budgets in scenario 2.
Mehtod/Item | Annual active energy loss (kW) | Energy not-met ((MWh/yr)) |
---|---|---|
Without RES | 603,362.93 | 214.03 |
Without RES, Deterministic | 302,751.62 | 118.64 |
Without RES, Robust | 389,490.39 | 161.15 |