Table 2 Specifications of the proposed system.

From: Coordinated charging of EV fleets in community parking lots to maximize benefits using a three-stage energy management system

Parameters

Values

Community parking lot

 Total area of a parking

600 m2

 Number of EVs

50

 Peak capacity of PV system

50 kW

 Peak capacity of a PV module

345 W

 Rated capacity of wind turbine

30 kW

Building prosumers

 Number of buildings

2

 Area of B1

180 m2

 Area of B2

200 m2

 Peak capacity of PV system

20 kW

 Peak capacity of PV module

345 W

Building backup unit

 Rated capacity of each BBU

50 kWh