Fig. 9

Post debris flow scenarios from Pettimudi (a) upstream erosion of gully validated by exposed bedrock (men for scale), (b) observed entrainment in gully along with scouring of side banks, (c) vegetation (tea gardens) destroyed due to flow, (d) destroyed layams due the flow in zone-2, (e) runout deposition at flat terrain.