Table 4 The best solution in 40 trial runs from three implemented methods.
Method | WFs | PVFs | BESS |
---|---|---|---|
SSA | Bus: 16–15 wind turbines (1-Phase) Bus: 112–14 wind turbines (1-Phase) | Bus: 49–8408 photovoltaic modules (3-Phase) Bus: 106–4257 photovoltaic modules (1-Phase) | Bus: 15 0.554 MW/1.488 MWh (1-Phase) |
COA | Bus: 05–15 wind turbines (1-Phase) Bus: 113–09 wind turbines (1-Phase) | Bus: 6–10,000 photovoltaic modules (1-Phase) Bus: 22–10,000 photovoltaic modules (1-Phase) | Bus: 5 0.539 MW/1.341 MWh (1-Phase) |
MCOA | Bus: 05–15 wind turbines (1-Phase) Bus: 113–09 wind turbines (1-Phase) | Bus: 6–10,000 photovoltaic modules (1-Phase) Bus: 23–10,000 photovoltaic modules (3-Phase) | Bus: 5 0.486 MW/1.342 MWh (1-Phase) |