Table 2 Economic analysis of the reinforcement.

From: Stability analysis of a multistep method for excavating high spoiled slopes on the Guigu expressway: a case study

No.

Project

Cost/million CNY

 

Complete work

 

1

Filling soil

+ 0.13

2

Retaining wall pile foundation

+ 0.40

3

Gravity retaining wall

+ 0.18

 

Canceled work

 

1

Slope protection

− 0.51

2

New retaining wall pile foundation

− 3.13

 

Incomplete work

 

1

Excavation

+ 1.14

2

Filling soil

+ 0.41

3

New spoil heap disposal

+ 0.12

4

C20 rubble concrete retaining wall

+ 0.35

5

Land acquisition

+ 0.94

 

Total

1.11