Table 5 Identified accidents and sources of the target project.
Type | Symbol | Description |
---|---|---|
Accident | A1 | Collapse |
A2 | Surface settlement | |
A3 | Heaving or blow-out | |
A4 | Mud/water inflow | |
A5 | Cutter head blockage | |
Source | S1 | Faults |
S2 | Shallow cover depth | |
S3 | Mixed ground | |
S4 | Cross-passage | |
S5 | High water pressure | |
S6 | Weathered ground |