Table 6 Comparative environmental analysis of each cascade cycle.

From: A novel ultra-low temperature cascade refrigeration with dual auxiliary loop to enhance thermal performance

Working conditions

Cascade cycle configurations

Exergy destruction rate (KJ)

Work input (KJ)

COP

Exergetic efficiency

Total TEWI (tnKgCO2)

EII

m_CO2 (Kg)

Operational cost US dollars

TC = 323 K, TE = 193 K

CRDAC

149.9

263.8

1.26

0.43

3944

36.77

466

52,765

CRSAC

454.7

378.5

0.87

0.20

5650

39.71

668

75,694

CRMP

253.7

684.9

0.41

0.62

10,208

51.92

1210

136,974

CCRS

253.7

421.3

0.64

0.39

6287

39.89

744

84,286

TC = 318 K, TE = 193 K

CRDAC

148.4

264.3

1.25

0.44

3952

36.19

467

52,864

CRSAC

422.2

368.4

0.89

0.15

5501

54.45

652

73,690

CRMP

235.8

635.2

0.44

0.63

9469

48.68

1122

127,049

CCRS

236.1

396.8

0.68

0.40

5922

39.2

701

79,353

TC = 313 K, TE = 193 K

CRDAC

147.1

264.9

1.24

0.45

3960

35.68

468

52,984

CRSAC

390.9

358.1

0.92

0.10

5346

86.67

633

71,617

CRMP

219.9

589.5

0.47

0.635

8788

45.32

1041

117,895

CCRS

220.4

374.1

0.72

0.41

5585

38.6

661

74,823