Table 6 Cumulative oil production at 99% water cut: with versus without dynamic heterogeneity under different injection rates.

From: An efficient multiscale simulation framework integrating dynamic heterogeneity for accurate waterflooding prediction

Case

Cumulative oil production (104 m3)

Increment (%)

Static

Dynamic

Q = 50

5.8301

6.9091

18.07

Q = 100

5.8857

7.5858

28.88

Q = 200

5.7821

8.4125

45.49