Table 2 Results of different algorithms.
Uncertainty model | Solver | F1 ($), F2 ($), F3 ($2) | StD (%) | Convergence iteration | Computational time (sec) |
---|---|---|---|---|---|
UT method | DE | 3171, 429.03, 5.18 | 2.51 | 1967 | 181.9 |
SCA | 3064, 437.22, 4.38 | 1.97 | 1722 | 162.7 | |
ABC | 2932, 489.21, 3.64 | 1.54 | 1235 | 130.5 | |
HBMO | 2911, 493.15, 3.52 | 1.41 | 1011 | 125.1 | |
HBMO + ABC | 2860, 502.31, 3.17 | 0.95 | 732 | 113.2 | |
SBSO with 40 scenarios | HBMO + ABC | 3082, 473.2, 4.79 | 0.951 | 745 | 183.3 |
SBSO with 60 scenarios | HBMO + ABC | 2943, 495.73, 4.03 | 0.952 | 749 | 234.5 |
SBSO with 80 scenarios | HBMO + ABC | 2865, 500.98, 3.41 | 0.953 | 753 | 278.4 |
SBSO with 100 scenarios | HBMO + ABC | 2862, 501.67, 3.32 | 0.953 | 756 | 309.3 |