Table 7 The calculation results of t-test.

From: Construction cost prediction model for agricultural water conservancy engineering based on BIM and neural network

Material

Assumption

Levene test of

variance equation

t-test pf mean–variance

F

Sig

t

df

sig(Bilateral)

Mean difference

Standard error

C25 concrete

Variance is equal

0.203

0.658

-2.630

18.000

0.017

-16.419

6.243

Variance inequality

–

–

-2.630

15.229

0.019

-16.419

6.243

C30 concrete

Variance is equal

1.952

0.179

-2.508

18.000

0.022

-16.146

6.437

Variance inequality

–

–

-2.508

14.106

0.025

-16.146

6.437

HRB400 steel bars

Variance is equal

2.718

0.117

4.201

18.000

0.001

297.914

70.921

Variance inequality

–

–

4.201

13.633

0.001

297.914

70.921