Table 8 Comparison of construction cost prediction results of different models.

From: Construction cost prediction model for agricultural water conservancy engineering based on BIM and neural network

Month

True value

SSA-PGNN

prediction value

SSA-BP

prediction value

PGNN

prediction value

3

263,324.88

265,356.00

274,987.44

272,039.04

4

44,951.66

44,975.43

46,698.14

46,406.48

5

37,861.71

38,043.00

39,309.70

39,303.79

6

42,269.57

42,449.07

43,860.44

42,221.06

7

215,982.71

219,069.40

225,061.55

223,178.05

8

230,316.48

226,773.60

240,520.56

237,943.92

9

302,193.60

304,266.00

315,579.42

312,197.64

MAPE

2.99%

3.88%

5.15%

R2

0.9819

0.9643

0.9290

RMSE

0.1358

0.1683

0.2041