Fig. 14

Time to reach full consolidation against effective confining pressures for ECS stabilized with L and L-SF at curing periods of (a) 1 day; (b) 7 days; (c) 14 days; and (d) 30 days.

Time to reach full consolidation against effective confining pressures for ECS stabilized with L and L-SF at curing periods of (a) 1 day; (b) 7 days; (c) 14 days; and (d) 30 days.