Table 3 Compromise solution between MOC and MSI at FT = 0.05 MW for different solvers.

From: Impacts of flexible renewable hybrid system with electric vehicles considering economic reactive power management on microgrid voltage stability and operation

Algorithm

MOC ($)

MSI (p.u.)

Iteration in convergence point

Calculation time (min)

IPOPT

1465.1

22.6

141

6.01

CONOPT

1474.1

22.4

199

7.02

DIOPT

Infeasible solution

MINOS

1491.2

22.2

232

10.1

OQNLP

Infeasible solution

BARON

1499.3

21.9

299

13.3