Fig. 6
From: Mechanism and control measures for floor heave in gob-side entry of weakly cemented soft rock

Floor cracking in the 11,304 tail entry during excavation.
From: Mechanism and control measures for floor heave in gob-side entry of weakly cemented soft rock
Floor cracking in the 11,304 tail entry during excavation.