Fig. 7
From: Mechanism and control measures for floor heave in gob-side entry of weakly cemented soft rock

Floor heave in the 11,304 tail entry during mining.
From: Mechanism and control measures for floor heave in gob-side entry of weakly cemented soft rock
Floor heave in the 11,304 tail entry during mining.