Table 2 Floor bolt design schemes.

From: Mechanism and control measures for floor heave in gob-side entry of weakly cemented soft rock

Scheme

Specific measures

Scheme 1

No floor bolts are installed on either side of the roadway. Only the original bolt-cable support from the excavation period is retained

Scheme 2

Based on the original support, a row of floor bolts is installed on both sides of the roadway. The bolts are inclined at 60° outward from the horizontal direction, with a spacing of 1.0 m and a length of 2.4 m

Scheme 3

Based on the original support, a row of floor bolts is installed on the coal pillar side of the roadway. The bolts are inclined at 60° outward from the horizontal direction, with a spacing of 1.0 m and a length of 2.4 m

Scheme 4

Based on the original support, a row of floor bolts is installed on the solid coal side of the roadway. The bolts are inclined at 60° outward from the horizontal direction, with a spacing of 1.0 m and a length of 2.4 m