Table 5 Economic analysis between standard RO and the proposed ROKSM model.

From: Enhancing mass transfer in RO membranes powered by tidal energy using static mixers: a CFD study

Parameter

Standard RO

ROKSM

Plant Capacity

10,000 m3/day (3.65 M m3/year)

10,000 m³/day (3.65 M m³/year)

Water Flux

13 m/h

16 m/h (23% higher)

Membrane Area

32,051 m²

26,042 m² (18.75% reduction)

Capital Costs (CapEx)

 Membrane Modules

1.6 M$ ($50/m2 × 32,051 m2)

1.3 M$ ($50/m2 × 26,042 m2)

 Pumps and ERDs

2.0 M$

2.2 M$ (higher due to pressure drop)

 Tidal Energy Infrastructure

0 $

1.5 M$

  Other Infrastructure

3.0 M$

3.0 M$

Total CapEx

6.6 M$

8.0 M$

  Annualized CapEx (20 years, 5%)

530,000 $/year

642,000 $/year

Operational Costs (OpEx)

  Energy

1.095 M$ (2.5 kWh/m3 × $0.12/kWh)

410,625$ (2.25 kWh/m3 × 0.05 $/kWh)

  Maintenance (2% of CapEx)

132,000 $

160,000 $

 Membrane Replacement (20%/year)

320,000 $

260,000$

Total OpEx

1.547 M$/year

830,625 $/year

LCOW

0.568 $/m³

0.403 $/m3 (29% lower)