Table 4 Operating-theatre internal gains and control settings implemented in TRNBuild (specialities OT).

From: Reclassifying hospital energy demand toward industry-like requirements for hygienic and resilient indoor environments

TRNBuild gain/control

Assigned value

Unit

Schedule

Description/source

Occupancy gain (Gains_OT)

0.125 persons/m\(\vphantom{0}^{2}\), 160 W/person

W/m\(\vphantom{0}^{2}\)

OCC_OT

Surgical staff + patient metabolic load; based on ASHRAE 62.1 and UH Oujda practice.

Equipment gain (Gain_Equip_OT)

75 W/m\(\vphantom{0}^{2}\)

W/m\(\vphantom{0}^{2}\)

OCC_OT

Surgical lights, monitors, anesthesia machines; aligned with ASHRAE 90.1 surgery baseline.

Lighting gain (Gain_Light_OT)

23.68 W/m\(\vphantom{0}^{2}\)

W/m\(\vphantom{0}^{2}\)

LIGHT (on during activity)

Surgical task lighting; ASHRAE 90.1 lighting density.

Ventilation rate

20 ACH (100% OA)

1/h

VENT_OT

High-ventilation regime consistent with ASHRAE 170 for surgery.

Cooling availability

22\(\vphantom{0}^{\circ }\)C setpoint, power unlimited

\(\vphantom{0}^{\circ }\)C/W

COOL_OT

Cooling dominates daytime loads; humidity control active.

Relative humidity setpoint

50%

%

COOL_OT

Sterile-room humidity band (ASHRAE 170).

Infiltration

0.20 ACH

1/h

Constant

Minimal leakage due to positive pressurisation.