Table 2 The %error comparison for the selected data points between the drill-RQD and the CSAMT-RQD.
CSAMT data points (selected) | Drilling data | %Error | ||||||
---|---|---|---|---|---|---|---|---|
CSAMT sounding number | Resistivity (Ωm) | Predicted RQD’ (%) using Eq. 2 | Borehole name | Depth (m) | Measured RQD (%) | RQD’ vs. RQD | RQD” vs. RQD | |
A5 | 486 | 47 | 35 | W1 | 25 | 37 | 21 | 5 |
A5 | 782 | 63 | 63 | W1 | 115 | 61 | 3 | 3 |
C8 | 610 | 55 | 44 | W2 | 10 | 43 | 22 | 2 |
C8 | 1035 | 72 | 73 | W2 | 130 | 77 | 7 | 5 |
D2 | 942 | 69 | 70 | W3 | 85 | 72 | 4 | 3 |
D2 | 1661 | 87 | 91 | W3 | 150 | 91 | 4 | 0 |
D15 | 75 | 1 | 8 | W4 | 25 | 6 | 83 | 25 |
D15 | 163 | 12 | 14 | W4 | 85 | 15 | 20 | 7 |
E15 | 879 | 66 | 67 | W5 | 60 | 69 | 4 | 3 |
E15 | 1490 | 84 | 87 | W5 | 200 | 90 | 7 | 3 |
E21 | 326 | 34 | 25 | W6 | 80 | 24 | 29 | 4 |
E21 | 535 | 50 | 39 | W6 | 120 | 38 | 24 | 3 |