Table 11 Comprehensive income value of each scheme.

From: TOPSIS prefabricated building construction evaluation based on interval-valued Pythagorean fuzzy numbers based on prospect theory

 

\(\phi ^{ + }\)

\(\phi ^{ - }\)

A1

3.308

−2.977

A2

2.976

−2.931

A3

3.124

−2.231