Fig. 7
From: Multi-resource constrained elective surgical scheduling with Nash equilibrium toward smart hospitals

An illustration of the Gantt chart with medical staff over time based on the example in Table 5.
From: Multi-resource constrained elective surgical scheduling with Nash equilibrium toward smart hospitals
An illustration of the Gantt chart with medical staff over time based on the example in Table 5.