Table 3 Simulated test results for test system 1 only economic scheduling.
Unit (MW) | Proposed method | TMDE | MBFO | AMPSO |
---|---|---|---|---|
P1 | 33.7100 | 33.8686 | 33.71 | 33.71 |
P2 | 12.6500 | 12.7914 | 12.65 | 12.65 |
P3 | 150.5300 | 151.1071 | 150.53 | 150.54 |
P4 | 148.5000 | 147.0570 | 148.5 | 148.5 |
P5 | 296.3200 | 293.8652 | 296.33 | 296.32 |
P6 | 293.7100 | 296.5686 | 293.71 | 293.71 |
Total cost ($/h) | 47,176.6963 | 47,179.00 | 47,187.34 | 47,187.36 |
Total emission (kg/h) | 858.96 | 857.5902 | 857.80 | 857.79 |
Total loss (MW) | 35.12 | 35.2579 | 35.43 | 35.43 |
CPU time | 3.60 | 6.02 | 10.12 | 10.35 |