Table 1 Parameters and constants of cost analysis.
From: Techno-economic analysis of distribution system at various load models using MEWOA algorithm
Parameters | Value | Parameters | Value |
---|---|---|---|
\(\:{k}_{cp}\) | 57.6923 $/kW | \(\:{k}_{s1}\) | 1000 $/SC |
\(\:{k}_{ce}\) | 9.6154E-3 $/kWh | \(\:{k}_{s2}\) | 3 $/kVAr |
\(\:{k}_{lf\:}\) | 0.2707 | \(\:{k}_{4}\) | 0.07 $/kW |
\(\:{k}_{1\:}\) | 0.0 | \(\:{k}_{5}\) | 5 $/kW |
\(\:{k}_{2\:}\) | 20.0 | \(\:{k}_{6}\) | 3$/kVAr |
\(\:{k}_{3\:}\) | 0.25 | Â | Â |