Table 8 Economic cost analysis for integration of 2 pairs of DGs and SCs for 69 Bus.

From: Techno-economic analysis of distribution system at various load models using MEWOA algorithm

Algorithm/Cases

Item/Load

PDG (kW)

QSC (kVar)

CEL0 (Ă—1000)$

CEL (Ă—1000)$

CDG (Ă—1000)$

CSC (Ă—1000)$

CTO (Ă—1000)$

SEL (%)

DA

COM

2273.44

1293.00

9.47

0.53

45.47

4.88

15.25

94.38

CZ

2351.63

974.83

9.58

0.53

47.03

3.92

14.68

94.43

RES

1556.80

642.96

9.95

0.54

31.14

2.93

9.71

94.57

IND

2598.49

505.16

10.34

0.54

51.97

2.52

14.51

94.75

CI

2594.33

768.43

11.38

0.57

51.89

3.31

15.28

94.95

CP

2695.00

995.17

13.57

0.62

53.90

3.99

16.46

95.45

WOA

COM

2221.36

1517.68

9.47

0.54

44.43

6.55

15.66

94.30

CZ

2193.26

1683.27

9.58

0.54

43.87

7.05

16.02

94.32

RES

2488.09

1335.24

9.95

0.55

49.76

6.01

16.45

94.48

IND

2493.64

1275.02

10.35

0.56

49.87

5.83

16.29

94.63

CI

2423.78

1670.33

11.39

0.57

48.48

7.01

17.13

95.00

CP

2557.68

1794.81

13.58

0.61

51.15

7.38

18.17

95.50

GOA

COM

2298.26

1420.03

9.47

0.53

45.97

6.26

15.75

94.45

CZ

2220.12

1565.90

9.58

0.53

44.40

6.70

15.80

94.49

RES

2395.17

1359.47

9.95

0.54

47.90

6.08

16.05

94.62

IND

2524.96

1190.34

10.35

0.54

50.50

5.57

16.20

94.78

CI

2383.53

1680.77

11.39

0.57

47.67

7.04

16.96

95.02

CP

2559.87

1805.45

13.58

0.61

51.20

7.42

18.22

95.51

MEWOA

COM

2297.73

1419.65

9.47

0.53

45.95

6.26

15.75

94.45

CZ

2220.16

2143.27

9.58

0.53

44.40

8.43

17.53

94.49

RES

2384.53

1361.84

9.95

0.54

47.69

6.09

16.01

94.62

IND

2527.45

1185.61

10.35

0.54

50.55

5.56

16.19

94.78

CI

2383.37

1681.22

11.39

0.57

47.67

7.04

16.96

95.02

CP

2560.73

1804.60

13.58

0.61

51.21

7.41

18.22

95.51