Table 9 Economic cost analysis for integration of 3 pairs of DGs and SCs for 69 Bus.

From: Techno-economic analysis of distribution system at various load models using MEWOA algorithm

Algorithm/Cases

Item/Load

PDG (kW)

QSC (kVar)

CEL0 (Ă—1000)$

CEL (Ă—1000)$

CDG (Ă—1000)$

CSC (Ă—1000)$

CTO (Ă—1000)$

SEL (%)

DA

COM

2373.40

987.19

9.47

0.35

47.47

3.96

14.83

96.27

CZ

2161.26

1134.85

9.58

0.35

43.23

4.40

14.21

96.30

RES

2458.78

976.39

9.95

0.36

49.18

3.93

15.22

96.43

IND

2752.59

417.43

10.34

0.36

55.05

2.25

15.02

96.55

CI

2212.28

993.46

11.38

0.38

44.25

3.98

14.04

96.64

CP

2731.12

237.24

13.57

0.41

54.62

1.71

14.37

96.96

WOA

COM

2240.63

1430.00

9.47

0.28

44.81

7.29

15.49

97.02

CZ

2188.03

1525.94

9.58

0.29

43.76

7.58

15.52

96.98

RES

2357.09

1319.61

9.95

0.30

47.14

6.96

15.74

97.02

IND

2385.09

1039.02

10.35

0.32

47.70

6.12

15.04

96.92

CI

2154.87

1614.75

11.39

0.33

43.10

7.84

15.62

97.12

CP

2430.88

1946.32

13.58

0.34

48.62

8.84

17.99

97.53

GOA

COM

2293.60

1414.60

9.47

0.23

45.87

5.24

15.71

97.57

CZ

2210.29

1561.10

9.58

0.23

44.21

5.68

15.74

97.59

RES

2385.93

1355.99

9.95

0.23

47.72

5.07

16.00

97.66

IND

2515.59

1185.85

10.35

0.23

50.31

4.56

16.14

97.73

CI

2375.12

1676.52

11.39

0.24

47.50

6.03

16.91

97.86

CP

2544.93

1800.82

13.58

0.26

50.90

6.40

18.13

98.10

MEWOA

COM

2299.67

1418.55

9.47

0.23

45.99

7.26

15.75

97.56

CZ

2196.12

1592.08

9.58

0.23

43.92

7.78

15.76

97.57

RES

2364.89

1360.20

9.95

0.23

47.30

7.08

15.91

97.65

IND

2519.21

1178.06

10.35

0.24

50.38

6.53

16.13

97.73

CI

2365.19

1648.91

11.39

0.25

47.30

7.95

16.77

97.84

CP

2529.87

1812.56

13.58

0.26

50.60

8.44

18.09

98.10