Table 3 Impact of Dynamic Operators on GOA vs GOAIP.

From: Multi skill project scheduling optimization based on quality transmission and rework network reconstruction

Case size

Algorithm

Average objective value (30 experiments)

Standard deviation

Best objective value

Worst objective value

30

GOA

157.23

3.45

155.78

165.89

GOAIP

151.76

2.68

148.12

158.23

60

GOA

335.45

5.12

330.67

342.78

GOAIP

325.34

3.89

322.12

330.45

90

GOA

508.67

6.78

496.89

525.34

GOAIP

495.12

4.56

481.45

505.78

120

GOA

674.18

8.45

663.37

682.56

GOAIP

645.71

6.49

634.15

655.32