Fig. 17

Comparison of key performance metrics before and after capacitor bank installation for the IEEE 33-bus feeder (a) loss reduction percentage, (b) total cost ($), (c) total power loss (kW), and (d) total voltage deviation (pu).
Comparison of key performance metrics before and after capacitor bank installation for the IEEE 33-bus feeder (a) loss reduction percentage, (b) total cost ($), (c) total power loss (kW), and (d) total voltage deviation (pu).