Table 5 Electrolysis plants data inputs from 30 MW Global tender in 2023
From: Active trading and regulatory incentives lower the levelized cost of green hydrogen in Greece
Characteristic | Units | Average PEMEL | Average AEL |
---|---|---|---|
Source | Global tender | Global tender | |
Stack efficiency | kWh per kg H2 | 51.27 | 50.04 |
System efficiency | kWh per kg H2 | 54.08 | 53.88 |
Feed water consumption | L per kg H2 | 10.15 | 10.48 |
Degradation rate | % per 1000 h | 0.19 | 0.115 |
Stack lifetime | hrs | 70,000 | 80,000 |
Delivery pressure | bar | 35 | 18.72 |
Hot idle ramp rate | sec | 60 | 470 |
Cold idle ramp rate | sec | 2400 | 5700 |
Footprint | m-2 per MW | 57.5 | 60.20 |
Total system cost (including Stack and Balance costs) | mil Euros per MW | 1.43 | 0.896 |