Fig. 7

Effective shear stresses σ/xy—time histories on the base of rock Pier _1 (at the right side of rotunda). a Kalamata RQ; b Erzincan; c Aqaba RQ. The PGA value = 0.24 g. Before and after the installation of polymer anti-seismic piling

Effective shear stresses σ/xy—time histories on the base of rock Pier _1 (at the right side of rotunda). a Kalamata RQ; b Erzincan; c Aqaba RQ. The PGA value = 0.24 g. Before and after the installation of polymer anti-seismic piling