Table 5 Accelerated Rainfall Simulation Protocol: Scanning and Duration

From: Durability of Japanese-earth cob walls subjected to accelerated rain simulation

Step

Process

Duration (minutes)

1

3D scan of original test wall surface

 

2

Perforated pipe rain simulation delivery

15

3

3D scan

29 (average)

4

Central shower rain simulation delivery

15

5

3D scan

28.5 (average)

6

Perforated pipe rain simulation delivery

30

7

3D scan

31 (average)

8

Lateral diffusion rain simulation delivery

15

9

3D scan

31.5 (average)

10

Perforated pipe rain simulation delivery

15

11

3D scan

 

12

3D scan after the surface was dry at ambient temperature