Fig. 12: Loading result of deterioration information.
From: HBIM for the protection and management: a case study of Chinese timber architectural heritage

a The Deteriorated drawing interact with the three-dimensional model. The deteriorated drawing is shown on the left, while the three-dimensional model is displayed on the right. b Attribute of Guazigong: deteriorated information.