Fig. 4: The technical flow of building information model for the Main Hall of Chuzu Temple.
From: HBIM for the protection and management: a case study of Chinese timber architectural heritage

This figure delineates the four-stage modeling process for the Main Hall of Chuzu Temple: Step.1 Collection of multi-source information, Step.2 Creation of the architectural component family library, Step.3 Contruction of the geometric model, Step.4 Loading of non-geometric information.