Table 4 LB algorithm results over a randomly selected branched network area (Girona five clusters, blue cluster water tank in Fig. 3, public and private uses).
Budget (€K) | Pipe network length (m) | Transported water (m3) | Water served / total demand (%) | Execution time (s) |
|---|---|---|---|---|
500 | 3420 | 337 | 4.7 | 57 |
750 | 5191 | 529 | 7.4 | 59 |
1000 | 8464 | 777 | 10.9 | 159 |
1250 | 11,412 | 1228 | 17.2 | 273 |
1500 | 14,680 | 1477 | 20.7 | 384 |
1750 | 17,658 | 1906 | 26.7 | 392 |
2000 | 20,426 | 2086 | 29.2 | 493 |