Table 1 Mean number of PV, PV-T and ST collectors installed, aggregated over technology, for each of the case-study plants and locations considered determined by an optimisation to reduce the total lifetime cost of the system

From: Lifetime optimisation of integrated thermally and electrically driven solar desalination plants

Plant

\({\dot{m}}_{{{{\rm{prod}}}}}\) / m3day−1

Location

Batteries

PV collectors

PV-T collectors

ST collectors

Small

355

Abu Dhabi

17

127

0

5

Gran Canaria

108

227

5

9

Tijuana

299

504

130

84

La Paz

114

389

44

339

Medium

12057

Abu Dhabi

3000

2810

4

70

Gran Canaria

4920

3800

83

566

Tijuana

5580

5840

45

1420

La Paz

5110

3210

727

233

Large

169458

Abu Dhabi

43600

42000

213

1860

Gran Canaria

74100

57900

4870

4730

Tijuana

69800

69600

18000

28300

La Paz

46400

35300

14400

39300