Table 10 Sensitivity run — CO2 price: 300 €/t.

From: Modelling the high-voltage grid using open data for Europe and beyond

 

System costs (bn. €)

CAPEX (bn. €)

OPEX (bn. €)

Curtailment (TWh)

Generation (TWh)

GridKit

331.81

301.79

30.03

3027.28

3135.37

OSM

330.36

300.83

29.54

3024.33

3132.4

Delta (Percent)

−0.44

−0.32

−1.64

−0.1

−0.09

  1. Comparison of key result metrics between ENTSO-E map and OSM-based transmission grid.