Table 10 Sensitivity run — CO2 price: 300 €/t.
From: Modelling the high-voltage grid using open data for Europe and beyond
System costs (bn. €) | CAPEX (bn. €) | OPEX (bn. €) | Curtailment (TWh) | Generation (TWh) | |
|---|---|---|---|---|---|
GridKit | 331.81 | 301.79 | 30.03 | 3027.28 | 3135.37 |
OSM | 330.36 | 300.83 | 29.54 | 3024.33 | 3132.4 |
Delta (Percent) | −0.44 | −0.32 | −1.64 | −0.1 | −0.09 |