Table 2 Changes made before and after retrofit43.

From: Dataset on occupant behavior, indoor environment, and energy use before and after dormitory retrofit

SN

Parameter

Before Retrofit

After Retrofit

1

Year of Construction

1972

2022

2

Total Conditioned Space

5500 ft2

5500 ft2

3

Walls

3 Layered Walls (Exterior to Interior):

Layer 1: Precast concrete with 1 inch closed-cell extruded polystyrene (XPS) insulation (R-4.53)

Layer 2: 2 × 4 wood framed with 3.5 inch of fiberglass batt insulation (R-8.55)

Layer 3: Precast concrete extruded demising walls

5 Layered Walls (Exterior to Interior):

Layer 1: 3” Exterior insulated finishing systems (EIFS) (R-5.60)

Layer 2: TREMCO NewBrick

Layer 3: Precast concrete with 1 inch closed-cell extruded polystyrene (XPS) insulation

Layer 4: 7/16” Oriented Standard Board (OSB) (R-0.27)

Layer 5: 2 × 4 wood framed with 3.5 inch of fiberglass batt insulation.

4

Heating Units

Yes (Electric Baseboard Heater)

Yes (Heat Pump and Electric Baseboard Heater)

5

Cooling Units

No

Yes (Heat Pump)

6

HVAC (COP)

1.0

3.0 (effective)

7

PV Units

No

Yes (40–50 kWh PV Array)

8

Windows Type and Material

Metal-framed, thermally broken, double-pane (non-Low-E, non-argon) sliding windows.

Double-pane Casement Windows with low-E coating

9

Window (U Value)

0.64

0.28

10

Window (SHGC)

0.61

0.40

11

Doors (R Value)

2.27 (Insulated Metal Door)

10 (Fiberglass External Door)

12

Heat Recovery Ventilation Systems

No

Yes (LUNOS E2)