Figure 6

Longitudinal diagram of the horizontal subsurface flow constructed wetlands (HSCWs). (1) Inlet chamber; (2) distribution chamber; (3) growth chamber; (4) outlet chamber; (5) water sampling port. Arrows demonstrate the flow direction.

Longitudinal diagram of the horizontal subsurface flow constructed wetlands (HSCWs). (1) Inlet chamber; (2) distribution chamber; (3) growth chamber; (4) outlet chamber; (5) water sampling port. Arrows demonstrate the flow direction.