Table 3 Specifications and operating parameters of the Unit 1 boiler.

From: Full-scale experimental investigation of deposition and corrosion of pre-protector and 3rd superheater in a waste incineration plant

Nominal capacity

Nominal electricity production

Primary air flow

Secondary air flow

Steam temperature

Steam pressure

600 Tons/day

12 MWe

30~35 × 103 Nm3/h

6~8 × 103 Nm3/h

400 °C

4 MPa