Figure 1

Effort track lines in the AMAPPS study area during 2010–2013, most track lines were surveyed multiple times by shipboard and aerial surveys. Renewable energy areas include a 10 km buffer zone.

Effort track lines in the AMAPPS study area during 2010–2013, most track lines were surveyed multiple times by shipboard and aerial surveys. Renewable energy areas include a 10 km buffer zone.