Table 2 Computation time for generating a single 3D dose rate map.
Method | Time consumption (hr) | Relative time consumption |
|---|---|---|
Direct Monte Carlo (5% of actual events) | 235.20 | 1 |
Direct Monte Carlo (complete simulation) | 4704.03 | 20 |
VSV | 0.17 | 0.00074 |
Deep-dose (CNN) | 0.06 | 0.00026 |