Table 1 Data of the resultant force, shear force and axial force at each point.

From: Biomechanical analysis of costochondral graft fracture in temporomandibular joint replacement

 

Resultant force (N)

Vertical force (N)

Shear force (N)

Left

Right

Average

Left

Right

Average

Left

Right

Average

0 mm

421.3

414.7

418.0

402.3

382.7

392.5

− 113.2

− 133.7

− 123.5

2 mm

424.7

427.7

426.2

416.7

410.1

413.4

− 68.7

− 91.1

− 79.9

4 mm

434.2

433.4

433.8

431.0

427.9

429.5

− 30.7.

− 55.3

− 43.0

6 mm

445.0

452.5

448.8

443.2

444.5

443.9

5.6

− 24.9

− 9.7

8 mm

456.3

465.6

461.0

453.6

457.9

455.8

26.7

1.9

14.3

10 mm

317.6

291.5

304.6

249.2

240.8

245.0

196.7

159.6

178.2

12 mm

326.7

304.3

315.5

255.6

251.7

253.7

203.1

165.4

184.3

14 mm

334.6

317.2

325.9

263.9

264.6

264.3

205.3

168.3

186.8

16 mm

342.6

329.0

335.8

274.4

278.4

276.4

204.5

168.2

186.4

18 mm

351.2

340.3

345.8

286.4

291.8

289.1

202.6

167.1

184.9

20 mm

359.0

350.8

354.9

299.0

304.4

301.7

198.0

165.9

182.0