Table 1 Selected morphological parameters (number of low flow channels, depth of main channel), morphologic structure (in the right to left order) and W/D ratio of monitored cross-sections on river reaches where the river training was realized (Pre: before the flood event in July 2018; Post: after the flood event in July 2018 and management intervention).
