Figure 1
From: Observation and analysis of diving beetle movements while swimming

One forwarding cycle of a diving beetle: the period of motion is 272 ms, and includes (a) the power stroke and (b) the recovery stroke, the power stroke accounts for about 47% of the entire cycle, the scale bar = 20 mm.