Table 10 Comparison of energy between Scenarios 1 and 2.
Facility | S1 energy (KW/h) | S2 energy (KW/h) | Difference (KW/h) |
|---|---|---|---|
Screw pump | 300 | 288 | 12 |
Coarse and fine screen | 10.4 | 10 | 0.4 |
Grit and oil removal | 98.15 | 94.22 | 3.93 |
Primary clarifier | 55.58 | 53.4 | 2.18 |
Intermediate screw | 255 | 245 | 10 |
Anaerobic tank | 5.6 | 5 | 0.6 |
Anoxic tank | 36 | 33.85 | 2.15 |
IR | 50.4 | 30.24 | 20.16 |
Aeration tank | 1201 | 1056 | 145 |
Secondary clarifier | 64 | 62.5 | 1.5 |
RAS | 160 | 154 | 6 |
WAS | 16.5 | 16 | 0.5 |
Chlorination system | 109 | 109 | 0 |
Gravity thickener | 5.14 | 4.9 | 0.24 |
Mechanical thickener | 37.15 | 40 | 2.85 |
Blending | 15.5 | 15.5 | 0 |
Anaerobic digester | 118 | 118 | 0 |
EN-MBBR system | 0 | 35 |  − 35 |
EN-MBBR sludge production | 0 |  − 270 | 270 |
Total energy saved | Â | Â | 442.51 |