Figure 11
From: Experimental study and analytical model for the pore structure of epoxy latex-modified mortar

Relationships between location parameters (μi) and polymer-to-cement ratios (P/C); (a) 7, (b) 14, (c) 28, and (d) 90 days.
From: Experimental study and analytical model for the pore structure of epoxy latex-modified mortar

Relationships between location parameters (μi) and polymer-to-cement ratios (P/C); (a) 7, (b) 14, (c) 28, and (d) 90 days.